QGDW 10684-2025 同步发电机组电力系统稳定器PSS运行管理规定

ICS 29.240 CCS F 29 Q/GDW 国家电网有限公司企业标准 Q/GDW 10684—2025 代替 Q/GDW 684—2011 同步发电机组电力系统稳定器(PSS) 运行管理规定 Regulations on operation management of power system stabilizers for synchronous generating units 2025-10-31 发布 2025-10-31 实施 国家电网有限公司 发布 Q/GDW 10664—2025 目 次 前言··················································································································································II 1 范围··················································································································································1 2 规范性引用文件····························································································································1 3 术语和定义····································································································································1 4 管理职责········································································································································1 4.1 电网调度机构························································································································2 4.2 发电企业································································································································2 4.3 试验研究单位····················································································································2 5 入网管理········································································································································2 6 试验管理········································································································································3 7 运行管理········································································································································4 附录 A (规范性) 电力系统稳定器(PSS)试验及参数入库流程························5 附录 B (资料性) 电力系统稳定器(PSS)定检典型写法····································5 编制说明········································································································································7 I Q/GDW 10684—2025 前 言 本文件依据GB/T 1.1—2020《标准化工作导则 第1部分:标准化文件的结构和起草规则》的规定起草。 本文件代替Q/GDW 10684—2011《电能质量监测系统( PSS )运行管理规范》,与Q/GDW 10684—2011相比,除结构调整和编辑性改动外,主要技术变化如下: a) 增加了电能质量监测系统稳定运行和定位要求(见第 3 章); b) 更改了职责分工部分,对网调度机构、发电厂和试验研究单位职责进行了明确(见第 4 章,2011年版的第 4 章); c) 更改了机组新增、深调、抽蓄改造后PSS试验管理规定(见第 6 章,2011年版的第 5 章); d) 增加了水电机组、燃气机组PSS投运要求(见 5.3); e) 增加了抽蓄机组PSS涉网本反措及性能自动投入退出要求(见 5.4); f) 增加了谐波数据管理平台(国家电网公司电能质量在线监测管理平台(PGDW))开展PSS报告审核及PSS结果闭环(见第 6 章); g) 增加了火电机组深度调峰工况下PSS试验和PSS性能复核试验要求(见 6.5)。 本文件由国家电网有限公司科技创新部提出。 本文件由国家电网有限公司科技创新部归口。 本文件起草单位:国家电网有限公司华北分部、中国电力科学研究院有限公司、国网冀北电力有限公司。 本文件主要起草人:王强、张丽剑、贾凌波、王茂海、刘明松、曾璐、王秋楠、赵峰、何飞、周成、王德胜、赵兵、李文博、赵东平、何亚平、马晓光、陈哲、鲁兵、薛连杰、李马龙、李佳、马俊超、魏巍、吴翔、蒋维、张弛、杨斌、赵毅、李佳、秦禹、张鑫、高云鹤、武昭旭、王立慧。 本文件及其所代替文件的历次版本发布情况为: ——2012年3月首次发布; ——本次为第一次修订。 本文件在执行过程中的意见或建议反馈至国家电网有限公司科技创新部。 II

资源下载
下载价格8.88 椰币
VIP免费
购买后自动出现下载链接,如有疑问请加微信 xycost
0
GB/T 917-2026 2026.11.01-《公路路线标识规则和国道编号》
GB/T 917-2026 2026.11.01-《公路路线标识规则和国道编号》
8分钟前 有人购买 去瞅瞅看
没有账号?注册  忘记密码?

社交账号快速登录

微信扫一扫关注
BIM吧微信公众号二维码
扫码关注后会自动登录网站