本资源为《2026年最新输电线路基础工程标准施工工艺图解》,原帖附图共 4 张,以下为 OCR 整理的内容清单与说明,文件以网盘实际内容为准。
内容说明
2026年最新输电线路基础工程标准施工工艺图解
目录
- 第一节 混凝土台阶式基础、钢筋混凝土板柱基础
- 1 适用范围…………………………………………………………………….7
- 2 主要引用标准…………………………………………………………………7
- 3 工艺流程…………………………………………………………………….7
- 4 主要工艺流程质量控制要点…………………………………………………8
- 4.1 施工准备
- 4.1.1 技术准备
- 4.1.2 工器具准备
- 4.1.3 材料准备
- 4.2 基础坑深…………………………………………………………………9
- 4.3 基础平整…………………………………………………………………9
- 4.4 基础分坑…………………………………………………………………9
- 4.5 基坑开挖…………………………………………………………………9
- 4.6 钢筋制作安装
- 4.6.1 钢筋制作一般规定……………………………………………….12
- 4.6.2 钢筋加工……………………………………………………………13
- 4.7 模板安装…………………………………………………………………15
- 4.8 混凝土浇筑……………………………………………………………..16
- 4.9 基础混凝土养护………………………………………………………18
- 4.10 模板拆除……………………………………………………………….19
- 4.11 基坑回填……………………………………………………………….19
- 4.12 现场清理……………………………………………………………….19
- 4.13 质量验收……………………………………………………………….20
- 5 成品展示…………………………………………………………………….21
- 6 施工设计图…………………………………………………………………21
- 第二节 掏挖基础
- 1 适用范围
- 2 主要引用标准……………………………………………………………..22
- 3 工艺流程…………………………………………………………………22
- 4 主要工艺流程质量控制要点
- 4.1.1 技术准备………………………………………………………….23
- 4.1.2 工器具准备………………………………………………………..24
- 4.1.3 材料准备………………………………………………………….24
- 4.2 基础平整……………………………………………………………..24
- 4.3 基坑开挖……………………………………………………………..24
- 4.4 基础修整……………………………………………………………..25
- 4.5 钢筋制作安装………………………………………………………25
- 4.6 立柱模板安装………………………………………………………25
- 4.7 混凝土浇筑………………………………………………………….26
- 4.8 基础混凝土养护…………………………………………………….26
4.10 模板拆除··················································································26
4.11 基坑回填··················································································26
4.12 现场清理··················································································26
4.13 质量检验··················································································26
5 基础施工方案··················································································26
6 基础工程设计图··············································································27
第三节 灌注桩基础··············································································27
1 适用范围·····················································································27
2 主要引用标准···············································································27
3 工艺流程·····················································································27
4 主要工艺流程质量控制要点·····························································28
4.1 施工准备·················································································28
4.1.1 技术准备:·········································································29
4.1.2 工器具准备:·····································································29
4.1.3 材料准备:·········································································29
4.2 基面平整·················································································29
4.3 基础分坑·················································································29
4.4 基础开挖·················································································29
4.5 钢筋制作安装···········································································30
4.6 基坑支护·················································································31
4.7 桩基检测·················································································31
4.8 承台及连梁浇筑·······································································31
4.9 基础混凝土养护·······································································31
4.10 模板拆除···············································································31
4.11 基坑回填···············································································31
4.12 现场清理···············································································31
4.13 质量检验···············································································31
5 基础施工方案···············································································32
6 基础工程设计图···········································································32
第四节 人工挖孔桩基础········································································34
1 适用范围·····················································································34
2 主要引用标准···············································································34
3 工艺流程·····················································································34
4 主要工艺流程质量控制要点·····························································35
4.1 施工准备·················································································35
4.1.1 技术准备:·········································································35
4.1.2 工器具准备:·····································································35
4.1.3 材料准备:·········································································36
4.2 基面平整·················································································36
4.3 基础分坑·················································································36
4.4 基坑开挖·················································································36
4.5 钢筋制作安装···········································································36
4.6 模板安装制作···········································································36
4.7 主柱模板安装···········································································36
- 4.8 混凝土浇筑 36
- 4.9 桩基检测 36
- 4.10 承台浇筑 36
- 4.11 桩冠混凝土养护 36
- 4.12 模板拆除 37
- 4.13 场地清理 37
- 4.14 现场清理 37
- 4.15 质量检验 37
- 5 成品图示 37
- 6 基础工艺设计图 38
- 第五节 岩石锚杆基础 38
- 1 适用范围 38
- 2 主要引用标准 38
- 3 工艺流程 38
- 4 主要工艺流程质量控制要点 39
- 4.1 施工准备 39
- 4.1.1 技术准备: 39
- 4.1.2 工器具准备: 39
- 4.1.3 材料准备: 39
- 4.2 基础分坑 40
- 4.3 基础开挖 40
- 4.4 基坑开挖 40
- 4.5 锚孔钻进 40
- 4.6 锚杆抗拔验收 40
- 4.7 施工工艺控制 41
- 4.8 基础混凝土养护 41
- 4.9 模板拆除 41
- 4.11 场地清理 41
- 4.12 现场清理 42
- 4.13 质量检验 42
- 5 成品图示 42
- 6 基础工艺设计图 42
- 第六节 岩石嵌固式基础 43
- 1 适用范围 43
- 2 主要引用标准 43
- 3 工艺流程 43
- 4 主要工艺流程质量控制要点 44
- 4.1 施工准备 44
- 4.1.1 技术准备: 44
- 4.1.2 工器具准备: 44
- 4.1.3 材料准备: 45
- 4.2 基础分坑 45
- 4.3 基础分坑 45
- 4.4 基坑开挖 45
目录(续)
- 4.4.1 机械破碎开挖(适用于中风化岩、无爆破限制区域)……45
- 4.4.2 控制爆破开挖(适用于强风化岩、机械破碎效率低区域)……45
- 4.5 钢筋笼扎吊装件安装……46
- 4.6 混凝土浇筑……46
- 4.7 基坑回填(石粉渣土要求)……47
- 4.8 基础混凝土养护……48
- 4.9 模板拆除……48
- 4.10 现场清理……48
- 4.11 质量检验……48
- 5 成品展示……49
- 6 成品保护措施……49
第七章 螺旋锚基础
- 1 适用范围……50
- 2 主要引用标准……50
- 4 主要工艺流程质量控制要点……51
- 4.1 施工准备:……51
- 4.1.1 技术准备:……51
- 4.1.2 工器具准备:……51
- 4.1.3 材料准备:……52
- 4.2 基面平整……52
- 4.3 基础分坑……52
- 4.4 螺旋锚加工与验收……52
- 4.5 螺旋锚植入(入锚工序)……53
- 4.6 螺栓紧固……53
- 4.7 找坡找平(关键工序)……53
- 4.8 基础锚冠混凝土浇筑……54
- 4.9 基础混凝土养护……55
- 4.10 模板拆除……55
- 4.11 现场清理……55
- 4.12 质量检验……55
- 4.13 成品展示……55
- 5 施工图片……55
- 6 基础工艺设计图……56
第八章 机械挖孔桩基础
- 1 适用范围……57
- 2 主要引用标准……57
- 3 施工流程……57
- 4 主要工艺流程质量控制要点……58
- 4.1 施工准备:……58
- 4.1.1 技术准备:……58
- 4.1.2 工器具准备与检查……59
- 4.1.3 材料准备与检验……60
- 4.2 基面平整……60
- 4.3 基础分坑……60
以上内容根据原帖附图OCR整理,具体以原帖及下载文件为准。