2020.07.16-河南省建筑工程项目联合测绘技术导则(试行)

前言 为全面推进建设工程项目“联合测绘”工作,建立统一的建设工程项目联合测绘标准体系,根据 《河南省人民政府办公厅关于印发河南省全面推进建设工程领域联合审验实施方案的通知》(豫政办 〔2018〕78 号)有关要求,河南省住房和城乡建设厅、河南省自然资源厅委托河南省测绘地理信息 局,在认真总结实践经验,借鉴其他省市做法,广泛征求意见的基础上,研究制定了建设工程项目联 合测绘技术导则。 本导则主要技术内容是:1 总则;2 术语;3 基本规定;4 建筑面积计算规则;5 控制测量;6 细部测量;7 土地勘测定界;8 规划竣工测量;9 房产测量;10 消防测量;11 人防测量;12 地下 管线测量;13 雷电防护测量;14 建设用地复核测量及不动产测量;15. 成果数据要求。 本导则由河南省住房和城乡建设厅、河南省自然资源厅、河南省人民防空办公室、河南省气象局 根据各自职责管理,由河南省测绘地理信息局负责具体技术内容的解释,执行过程中如有意见或建议, 请反馈至河南省测绘地理信息局(地址:河南省郑州市金水区纬二路 10 号,邮编:450003),以便 今后修订时参考。 目录 1 总则························································································································1 2 术语························································································································2 3 基本规定··················································································································7 3.1 平面和高程系统······································································································7 3.2 测量精度···············································································································7 3.3 成果质量检查·········································································································8 4 建筑面积计算规则·····································································································9 4.1 一般规定···············································································································9 4.2 计算细则···············································································································9 5 控制测量················································································································16 5.1 平面控制测量········································································································16 5.2 高程控制测量········································································································17 6 细部测绘················································································································19 6.1 地形图测绘基本规定·······························································································19 6.2 地形图测绘内容·····································································································19 6.3 定线测量和拨地测量·······························································································21 6.4 规划监督测量········································································································21 7 土地勘测定界··········································································································23 7.1 一般规定··············································································································23 7.2 外业调绘··············································································································23 7.3 界址点的放样及界标的埋设·····················································································24 7.4 界址点测量···········································································································24 7.5 面积计算和汇总·····································································································25 7.6 勘测定界图···········································································································25 7.7 提交勘测定界成果资料····························································································26 8 规划竣工测量··········································································································27 8.1 一般规定··············································································································27 8.2 平面位置(细部点坐标)测量··················································································27 8.3 建筑高度及层高测量·······························································································28 8.4 建筑基底面积与建筑面积测量··················································································29 8.5 竣工地形图测绘·····································································································30 8.6 绿地核实测量········································································································31 8.7 车位测量与统计·····································································································32 8.8 主要技术经济指标汇总表编制··················································································32 8.9 竣工规划总平面图绘制····························································································33 8.10 竣工规划比对······································································································33 8.11 成果提交············································································································34 9 房产测量················································································································35

资源下载
下载价格6.88 椰币
VIP免费
购买后自动出现下载链接,如有疑问请加微信 xycost
0

评论0

请先
JGJ/T12-2019 轻骨料混凝土应用技术标准【附条文说明】
JGJ/T12-2019 轻骨料混凝土应用技术标准【附条文说明】
10分钟前 有人购买 去瞅瞅看
没有账号?注册  忘记密码?

社交账号快速登录

微信扫一扫关注
扫码关注后会自动登录网站